Numerical-Control 2-Roller Plate Bending Rolls
W21Y
Click image to view full size
For thin plates 1-3mm, one part per ~30 seconds, high precision for automotive and similar industries.
Urethane and steel roll combination for high efficiency and precision, W21Y-1x500 to W21Y-3x1300 series.
Basic Configuration
- Thin plate 1-3mm
- ~30 seconds per part
- Urethane roll forming
- High precision
Technical Specifications
| 加工板厚 | 1-3mm |
|---|---|
| Control Mode | PLC数控 |
| Series Models | W21Y-1x500 / W21Y-2x1000 / W21Y-3x1300 |
Online Inquiry
Fill in the form below and our sales engineer will contact you within 24 hours.
Related Projects
- Guangzhou HVAC Company ROBOT-III Duct Line Project Guangzhou, China
- Dongguan Sheet Metal CNC Bending Rolls Project Dongguan, China
- Southeast Asia ROBOT-II Duct Line Export Project Southeast Asia
Technical Resources
FAQ
View All FAQs →How much floor space is needed for a duct production line?
Line II needs about 30-50㎡, while Line IV/V requires 100-300㎡. Our engineers provide free layout planning.
Can you customize non-standard equipment?
Absolutely. We design and manufacture custom uncoiling lines, roll forming lines, CNC equipment and complete automation systems.
How do you handle voltage and standards for export?
Electrical systems can be built for target voltages (e.g. 380V/415V/440V) and local safety standards, with commissioning and acceptance before shipment.